Skip to main content
SpanVor

Sacramento–Roseville–Folsom growth and development

Sacramento–Roseville–Folsom industrial demand intelligence

Track housing, employment, infrastructure, retail, and other growth signals shaping industrial demand across Sacramento.

Industrial + small-bay snapshot

Sacramento–Roseville–Folsom

Reviewed industrial and small-bay project identities. Live pipeline is shown separately where lifecycle review is available; missing source lanes are never rendered as market zeros.
Withheld · acquisition incompleteAn incomplete or unpublished source lane is not evidence of zero market activity.

Construction-scope mix

49 new construction · 24 additions544 reviewed authority-level identities · not 544 new buildings
49new construction
24additions
328alterations
5tenant fit-outs
16site clearings
122scope not published

These are reviewed industrial work/project identities, not 544 new buildings. The source states only 49 as new construction and 24 as additions; 328 are alterations inside existing industrial buildings. Five are fit-outs, 16 are site clearings, and 122 do not publish a reliable construction scope.

Completed authority results

Authority-level onlynot a metro total
AuthorityProjects reviewedLive pipelineMapped
City of Sacramento441610
Sacramento County4170
City of West Sacramento40100
Placer County19190
City of Citrus Heights310

Each row is scoped to that authority’s retrieved records. The rows are not summed into a metro count or the national measured total; missing jurisdictions are not treated as zero.

Sacramento–Roseville–Folsom has no published metro project count because only five of 23 permitting authorities produced a gateable corpus. Authority rows show 544 reviewed identities and 98 live (78 under development and 20 planned), with 86 completions in the last 24 months. The scope mix is materially alteration-heavy: 49 new construction, 24 additions, 328 alterations, five fit-outs, 16 site clearings, and 122 with scope not published. El Dorado County, Elk Grove, Roseville, Folsom, Rocklin, Rancho Cordova, Davis, Woodland, and remaining authorities are unmeasured rather than zero. Existing Supply retains 51 leads and Demand retains 339 signals as separate, nonadditive layers.

Accounting: Project counts are reviewed project identities, not raw permit rows or necessarily the live pipeline. Building area and value are shown only when the source or reviewed description supports them.

Loading the interactive growth map…