Skip to main content
Pre-permit · forward supply

Pre-permit decisions

524 industrial-relevant land-use decisions — entitlement, rezoning & site-plan approvals. This is the earliest stage of the forward-supply funnel: a parcel rezoned to industrial / higher-FAR M-zoning signals what's coming, before any construction permit is pulled.

501
Master Use Permit
King, WA
Pre-permit
502
Master Use Permit
King, WA
Pre-permit
503
Master Use Permit
King, WA
Pre-permit
504
Design Review
King, WA
Pre-permit
505
Master Use Permit
King, WA
Pre-permit
506
Master Use Permit
King, WA
Replacing industrial with 400,000 sf multi-family structure
Pre-permit
507
Master Use Permit
King, WA
Supports King County Waste Water Treatment facility
Pre-permit
508
Master Use Permit
King, WA
Pre-permit
509
Master Use Permit
King, WA
Pre-permit
510
Master Use Permit
King, WA
Pre-permit
511
Master Use Permit
King, WA
Pre-permit
512
Master Use Permit
King, WA
Pre-permit
513
Master Use Permitflex light industrial
King, WA
Allows mixed-use including storage and mercantile.
Pre-permit
514
Master Use Permitmanufacturing
King, WA
Previously allowed manufacturing, now cancelled for restaurant.
Pre-permit
515
Master Use Permitflex light industrial
King, WA
Enables construction of a building for bus shelter and repair.
Pre-permit
516
Master Use Permit
King, WA
Pre-permit
517
Master Use Permitwarehouse distribution
King, WA
Demolish 5244 s.f. warehouse, potentially freeing land for redevelopment.
Pre-permit
518
Master Use Permit
King, WA
Pre-permit
519
Master Use Permit
King, WA
Pre-permit
520
Design Review
King, WA
Pre-permit
521
Master Use Permitwarehouse distribution
King, WA
Enables change of use and tenant improvement in existing warehouse.
Pre-permit
522
Master Use Permitflex light industrial
King, WA
Proposed 44,000 sqft mixed-use development
Pre-permit
523
Master Use Permitmanufacturing
King, WA
Replaces steel monopiles for existing industrial facility
Pre-permit
524
Master Use Permit
King, WA
Pre-permit
Page 11 of 11